Modular Hills Part 3

Corner to Straight Transition ModuleI guess I am still on European time as I was awake at 3:30 AM this morning. I decided to get up and address the corner adapter problem. I ended up building a new module which connects the corner to the straight. It is 16 studs wide instead of 32. ModulesIn the end, this was a better solution than trying to lay something on top of one of the straight modules. I need two corner adapters so I still have another to build. They go quick though. I also need to build the 16×16 filler corner which goes on the backside of the corner module. That won’t take long at all though. I am however, now out of 2×2 black bricks so I am not sure what I will do. I still have lots to do before tomorrow

This entry was posted in NCLTC, Standards. Bookmark the permalink.

Leave a Reply